Category Archives: Millcreek Home


Permalink to Building Rough Bucks

Building Rough Bucks


Permalink to Demo Day

Demo Day


Permalink to Forming the Footings

Forming the Footings


Permalink to Renewing our Services

Renewing our Services

Today we renewed our services. There was a problem with our water line containing lead but we replaced it.


Permalink to Our New home in Millcreek

Our New home in Millcreek

Scott and I purchased this tiny wartime home with the aid of our realtor Danelle Bolinski.  The home is two blocks away from the Millcreek ravine walking trails and two blocks off Whyte ave.  Our plan is to knock it down in the spring of 2010 to make way for our new open concept home.  Stay tuned for updates on our building progress.

 


Permalink to Pruning Trees for Clearance

Pruning Trees for Clearance

It has come to my attention that trees can only be pruned during certain seasons as per City bylaws. We have a large mature elm on our lot and would like to be able to keep it. Elms can only be pruned in Edmonton between October 1 and March 31. We plan to start demo and building in May so this means that pruning for clearance needs to be addressed asap. I have contacted Alberta Arborists, a company I have dealt with in the past and have found them to be knowledgeable and fair cost-wise. They will go out and assess the pruning necessary for branches that may interfere with our second floor. The root system generally grows 1 and a half times wider than the branches so this also needs to be assessed to determine if our foundation will damage the roots. Too many damaged roots will cause the tree to die and will dictate if keeping the tree is a possibility.


Permalink to Advantage ICF Foundation Install

Advantage ICF Foundation Install


Permalink to First Floor Framing

First Floor Framing

Thanks to the help from Dave and Jesse we have our first floor framed and are beginning the second.  We’ve learned a lot and can see the house really taking form.  It is very exciting to see our design and dreams becoming reality.

 


Permalink to Second Floor and Roof

Second Floor and Roof

This is the 2nd floor and roof being framed.  It has been a wet couple of weeks but we managed to get the roof on.